S-100

100-series trains were the first high-speed trains to start running in April 1992. These trains were an upgrade of the TGV Atlantic with numerous modifications to adapt them to the operating conditions and the Spanish market, such as a new system for reducing the effect of pressure waves in the tunnels, the increase in power of the air conditioning equipment and the incorporation of LZB and Asfa control and signalling equipment.

A technical and interior remodelling was finalised in summer 2009 after 15 years of service to adapt the trains to new market requirements.