S-104

The 104 series trains (and their evolution from the 114 series) are Renfe's and the world's first to be specifically designed and built for high-speed mid-distance services. They are trains formed by four carriages, with the possibility of multi-wheel drive of up to three compositions and with a maximum commercial speed of 250 km/h.

104-series trains are part of the contract awarded on 25 May 2001 to the consortium comprising of Alstom and CAF, which included the construction of a batch of 20 international-gauge high-speed trains for mid-distance services.

A few years later Renfe added 13 other units from this series to its fleet, but with certain updates, so it was renamed s-114, which included traction, brake and energy efficiency improvements, as well as improved comfort and interior design, as the whole train was configured as one class.